3rd Street Rehabilitation
The place
Thirteen historic properties in the downtown Leland Historic District, on the banks of Deer Creek. Phase 1 covered three contiguous buildings on 3rd Street whose original storefronts had been lost.
The decisions
Kudzu Collective designed replicated storefronts created from historic photographs taken during the 1927 Flood — a documented record of what the block actually looked like, rather than a guess at period character. Historic tax credits were utilized by the owner.
The outcome
Phase 1 was completed in 2024, and the owner has located boutique retail in all three finished spaces.
What's next
Phase 2 is currently in design. As with Phase 1, Ryan Biles has designed new storefronts for three buildings that are architecturally compatible with each building's period of significance. A mix of retail, wellness services, and a coffee shop is contemplated for these tenant spaces.
Why replicate rather than invent
See more of the work
Every project starts with a place worth keeping and a coalition ready to keep it.